Select Projects | Project Details

DWC Airport Bus Staging Facilities

Project Description: MEP works for Bus Staging and Maintenance Facilities for Dubai World Central Al Maktoum Airport at Jebel Ali, UAE

Project Type: Build only.

Client: Government of Dubai, Department of Civil Aviation, Dubai, UAE.

MEP Consultants: Dar Al Handasah, Dubai, UAE.

Scope of Works
  • 300 tons of cooling load comprising Package Air Conditioners and Split Units with Air Distribution System.
  • Firefighting System including Fire Pump Sets, Breaching Inlet, Fire Hose Cabinets, Fire Extinguishers and Wet Sprinklers.
  • Cold and Hot Water Distribution System.
  • Water and Soil Stack Drainage Distribution System; Storm Water System.
  • Sanitary Wares and Bathroom Accessories.
  • Compressed Air System.
  • 11KV Ring Main Units, RMUs (2 nos.), Dry type Transformers (2 nos.) and 2 kilometers of MV cabling works.
  • Low Voltage Switchgear comprising Main Distribution Boards, Capacitor Banks, MCCs, SMDBs, DBs and Feeder Pillars.
  • Diesel Generator Sets (3 nos.) with ATS Panels.
  • Earthing and Lightning Protection System.
  • Interior and Exterior Light Fitting including Street Pole Lights and Wiring Devices.
  • UPS and Emergency Central Battery Systems.
  • Lighting Control, CCTV, Security Access Control, Fire Alarm, VESDA, Intercom and Visitation System, Public Address, Audio Visual and Structural Cabling Network System.
  • Building Management System.