Hilton Beach Resort – Ras Al Khaimah

Project Description: This four star boutique beach resort on a 600m long stretch of reclaimed & shaped bay in Ras Al Khaimah consists of 151 rooms and suites in 39 chalets, several F&B outlets in two buildings, three swimming pools and a dedicated 22,000 sqft Spa and reception building. The design stage was fact tracked & completed three months prior to start of work on site. The Design & Build approach saved the client in excess of six months of conventional design development and tender periods, resulting in cost savings and an early start of the revenue cycle. The project was completed in exactly 366 days.

Project Type: Design & Build Fast Track Project

Client: Ras Al Khaimah Government / Hilton Hotels.

Consultants: WS Atkins & Partners Overseas.

MEP Consultants: Proleed, Dubai, UAE.

Scope of Works
  • 930 tons of cooling load connected to AHUs & FCUs through Primary and Secondary Chilled Water Network.
  • Hot Water Calorifiers and Circulation Pumps.
  • Cold Water Booster Pump sets and Water Distribution Network.
  • Water and Soil Stack Drainage Distribution System & Sump Pumps.
  • Fire Fighting Sprinkler Network.
  • Transformers with Power Correction Units; Low voltage Main and Sub Main Switchboard, MCCs and DBs.
  • Emergency Generator and ATS Panel.
  • Lighting and Power System.
  • Normal and Emergency Lights, Wiring Devices, Central Emergency Battery System and Distribution.
  • Fire Alarm System.